Skip to main content Skip to main navigation Skip to footer
954-921-7781
  • Login
Calvin, Giordano & Associates, Inc. | A Safebuilt Company | Homepage
  • Services
    • Building Department Services
    • Inspection Services
    • Plan Review
    • Construction Engineering and Inspection (CEI)
    • Construction Services
    • Engineering
    • Data & Technologies
    • Landscape Architecture / Urbanism
    • Planning
    • Transportation & Mobility
    • Surveying & Mapping
    • Facilities Management
  • Projects
  • About
    • Public Sector
    • Private Sector
    • Our Team
  • Resources
  • Careers
    • Career Opportunities
    • Student/Graduate Opportunities
  • Contact
Toggle navigation
    Home  /  Projects  /  Miami Beach  /  Miami Beach Recreational Corridor Phase II

Miami Beach Recreational Corridor Phase II

Miami Beach, Florida

CGA designed and permitted an on-grade, ADA-accessible pathway that supports the use of pedestrians and cyclists and an integral component of the City’s overall resiliency and climate adaptation plan, directly supporting the City’s investment in strengthening the dunes for storm surge protection and by providing a critical component of its alternative transportation network. The project is a part of the greater Atlantic Greenway Network, and comprises a critical component of the bicycle facilities throughout the City of Miami Beach. It connects Indian Beach Park on the south to the North Beach Recreational Trail at Allison Park with a 2-mile paver walkway, continuing the City’s unique branding qualities.

The path was permitted in accordance with the Florida Dept. of Environmental Protection’s and the Florida Fish and Wildlife Conservation Commission’s regulations, as the entirety of the project lies within State-owned lands. The scope of work included extensive public outreach, branding and site design, coastal engineering, dune planting plans, lighting design, and bidding and construction administration. The project connects business districts, cultural/tourism centers, parks, residential neighborhoods and the beaches, and it completed a major portion of the essential north-south connector of the AGN to facilitate pedestrian and non-motorized transportation throughout the City.

Miami Beach Recreational Corridor Phase II
Miami Beach Recreational Corridor Phase II
Miami Beach Recreational Corridor Phase II
Miami Beach Recreational Corridor Phase II

Services Provided:

  • Engineering
    • Civil Engineering/Roadway & Highway Design
    • Coastal Engineering
    • Electrical Engineering
  • Landscape Architecture / Urbanism
    • Landscape Urbanism
View All Services

Client:

City of Miami Beach

  • Services
    • Building Department Services
    • Inspection Services
    • Plan Review
    • Construction Engineering and Inspection (CEI)
    • Construction Services
    • Engineering
    • Data & Technologies
    • Landscape Architecture / Urbanism
    • Planning
    • Transportation & Mobility
    • Surveying & Mapping
    • Facilities Management
  • Projects
  • About
    • Public Sector
    • Private Sector
    • Our Team
  • Resources
  • Careers
    • Career Opportunities
    • Student/Graduate Opportunities
  • Contact
  • 954-921-7781
  • Login
    • Facebook
    • LinkedIn
    • Instagram
Calvin, Giordano & Associates, Inc. | A Safebuilt Company | Homepage
Services
  • Building Department Services
  • Construction Engineering and Inspection (CEI)
  • Construction Services
  • Data & Technologies
  • Engineering
  • Facilities Management
  • Inspection Services
  • Landscape Architecture / Urbanism
  • Plan Review
  • Planning
  • Surveying & Mapping
  • Transportation & Mobility
  • Projects
  • About
  • Resources
  • Careers
  • Login
Contact
  • Headquarters
  • 1800 Eller Drive, Suite 600
  • Fort Lauderdale, Florida 33316
  • P: 954.921.7781
  • F: 954.921.8807
  • Facebook
  • LinkedIn
  • Instagram
  • Terms of Use
  • Privacy Policy
  • Site Map